I-95 northbound: Exit 110 (Ladysmith) to Exit 118 (Thornburgh): One lane closed at mile marker 117 for Matta River bridge cleaning from 9pm to 5am, Monday through Thursday.
- Exit 118 (Thornburg) to Exit 126 (Spotsylvania): Monday through Thursday, 9 p.m. to 5 a.m. One lane closed at mile marker 119 due to Po River bridge cleaning.
- Monday-Thursday, 9:00 p.m.-5:00 a.m. One lane closed at mile marker 121 due to Ni River bridge cleaning.
- Bridge work Sunday through Thursday, 9 p.m. to 5 a.m.; Single lane closure at 9 p.m., followed by dual lane closure between mile markers 125 and 126 at 10 p.m. All lanes will reopen by 5 a.m. A new I-95 overpass will be constructed at Route 17 (Mills Drive).
- Monday through Thursday, 9 p.m. to 5 a.m., one lane closed at mile marker 126 for bridge cleaning of the Route 1 viaduct.
- Exit 130 (Route 3) to Exit 133 (Falmouth/Warrenton): Monday through Thursday, 9 p.m. to 5 a.m. Single lane closure on Rappahannock River Bridge and Route 17 elevated local and through lanes. . Cleaning the bridge.
- Exit 143 (Acquia/Garrisonville) to Exit 148 (Quantico): Sunday through Thursday, 9 p.m. to 4:30 a.m. Single lane closure at 9 p.m., followed by dual lane closure at 10 p.m. . Repairs will be made to the bridge joint at mile marker 145 over Acquia Creek.
I-95 southbound: Exit 148 (Quantico) to Exit 143 (Acquia/Garrisonville): Sunday through Thursday, 9 p.m. to 4:30 a.m. Single lane closure at 9 p.m., followed by dual lane closure at 10 p.m. . Repairs will be made to the bridge joint at mile marker 145 over Aquia Creek.
- Monday through Thursday, 9 p.m. to 10 a.m. 95 Express Lanes One lane closure between mile markers 148 and 146 due to Fredericksburg widening construction.
- Exit 140 (Courthouse Road) to Exit 136 (Centerport Parkway): Monday through Thursday, 4 a.m. to 10 a.m. 95 Express Lane Mile marker for slope repairs as part of the Fredericksburg expansion. 139-137 one lane closed.
- Exit 136 (Centerport Parkway) to Exit 133 (Falmouth/Warrenton): Monday midnight – 10:00 a.m. 95 Express Lanes Due to Fredericksburg expansion, I-95 southbound mile markers 136 to 134. 1 lane closed.
- Monday through Thursday, 9 p.m. to 10 a.m. Single lane closure at 9 p.m., followed by dual lane closure at 10 p.m. due to paving and other construction work on the 95 Express Lanes Fredericksburg Extension from mile markers 136 to 134 Masu.Dual lane closures will be allowed until 4:30 a.m. Single lane closures will last from 4:30 a.m. to 10 a.m.
- Exit 133 (Falmouth/Warrenton) to Exit 130 (Route 3): Monday through Thursday, 9 p.m. to 5 a.m. Single lane closure in local and through lanes of Route 17 overpass and Rappahannock River bridge. . Cleaning the bridge.
- Exit 126 (Spotsylvania) to Exit 118 (Thornburg): Monday through Thursday, 9 p.m. to 5 a.m. One lane closed at mile marker 126 for bridge cleaning of the Route 1 viaduct.
- Sunday through Thursday, 9 p.m. to 5 a.m. Single lane closures begin at 9 p.m., followed by double lane closures between mile markers 125 and 120 at 10 p.m. Milling and paving.
- Monday-Thursday, 9:00 p.m.-5:00 a.m. One lane closed at mile marker 121 due to Ni River bridge cleaning.
- One lane closed at Mile Marker 119 for bridge cleaning on the Po River from 9pm to 5am, Monday through Thursday.
- Exit 118 (Thornburg) to Exit 110 (Ladysmith): One lane closed at mile marker 117 for Matta River bridge cleaning from 9pm to 5am, Monday through Thursday.
Spotsylvania County: Route 1 northbound on Route 606 (Mud Tavern Road): Monday through Thursday from 8 a.m. to 4 p.m., and Friday from 8 a.m. to noon. One lane of National Route 606 is closed due to widening construction. The northbound right turn lane to eastbound Mudd Tavern Road will be closed.
- Route 3 (Plank Road), Route 621 (Orange Plank Road): 7 a.m. to 5 p.m. Monday through Thursday and 7 a.m. to noon Friday. One-lane traffic closure due to intersection renovation project.
- Route 601 (Lewiston Road): Alternating lane closures and markings Monday through Friday, 8 a.m. to 7 p.m. Construction of high friction surface treatment and pavement marking work near Mica Mine Road.
- Route 601 (Allitt Road): Alternating lane closures and markings Monday through Friday, 8 a.m. to 7 p.m. Installation of high friction surface treatment and pavement marking works near Greens Corner Road.
- Route 646 (Stanfield Road): Alternating lane closures and markings Monday through Friday, 8 a.m. to 7 p.m. Installation of high friction surface treatment and pavement marking works near White Angel Lane and Long Acres Lane.
- Route 649 (Seeds Road): Monday through Friday, 9 a.m. to 7 p.m. Pavement markings. One-way alternating traffic between Post Oak Road and Robert E. Lee Drive. A sign staff will guide you.
- Route 674 (Chancellor Road): Monday through Friday, 9 a.m. to 7 p.m. Milling and paving. Alternating one-way traffic between Old Plank Road and Gordon Road will be directed by flag bearers.
- Route 711 (South Point Parkway): One lane closed between Route 1 and Pacific Drive, Tuesday through Friday, 3 a.m. to 3:30 p.m. Bridge work as part of South Point Parkway widening and improvements.
- Route 721 (Grand Brooks Road): Monday through Friday, 7 a.m. to 5 p.m. Alternating lane closures between Attorney Road and Stubbs Bridge Road for Cape Seal surfacing. Alternating one-way traffic will be guided by flag crews and pilot trucks.
- I-95 Southbound Exit 126 Exit Ramp and Route 1 Southbound: A second right turn lane from the I-95 southbound Exit 126 exit ramp to Route 1 southbound is under construction. Route 1 southbound has been widened from the exit ramp to South Point Parkway, adding a right-turn lane. A second right-turn lane will be added from southbound Route 1 to South Point Parkway. Traffic islands will be installed along South Point Parkway as a safety improvement and will allow left turns into driveways, but will restrict through and left-turn traffic exiting side streets. A right-turn lane has been added to Route 1 southbound South Point Parkway. The project is expected to be completed in August 2025.
- Route 3 and Orange Plank Road: Work began on Wednesday, May 8 to change the intersection of Route 3 and Orange Plank Road. Shift to new traffic patterns to increase safety, improve traffic flow and reduce collision points. The project will be completed in summer 2024.
- Route 17 (Mills Drive) Viaduct Replacement and Widening: Construction began in December 2020 to replace the existing two-lane interstate viaduct on Route 17 with a four-lane bridge. Route 17 is widened to four lanes to just east of the Hospital Boulevard/Germanna Point Drive intersection. As part of this project, shared paths, sidewalks and pedestrian crossing facilities will be installed. Completion of the project was scheduled for late February 2024, but the project is currently scheduled to be completed in summer 2024.
- Route 208 (Courthouse Road) and Hood Drive: Hood Drive will be reduced to one lane between Route 1 and Route 208 (Courthouse Road) to northbound traffic only. Southbound traffic should follow the detour marked along Courthouse Road and Route 1 southbound. A future Veterans Health Administration clinic will be built and new turn lanes are under construction. Additional turning lanes will be constructed on northbound Hood Drive approaching Courthouse Road. Raising the median on Hood Drive will separate northbound and southbound traffic between Courthouse Road and McGowan Drive. Sidewalks, crosswalks, and pedestrian crossing equipment will be added to the intersection. The project is expected to be completed in June 2024.
- Widening of Route 606 (Mud Tavern Road): Mud Tavern Road is being widened to four lanes between I-95 and Route 1. A new secondary access route, Route 2092, will be constructed parallel to Mud Tavern Road and connect to South Roxbury. Mill Road and Dumbbell Lane. The project is expected to be completed in May 2025.
Stafford County: Augustine North Subdivision: Monday through Friday, 9 a.m. to 8 p.m. Milling and paving various routes throughout the Augustine North Subdivision between Courthouse Road and Mountain View Road. Reporters direct traffic through the work zone.
- Route 635 (Decatur Road): Monday through Friday, 7 a.m. to 5 p.m. Alternating one-way traffic on Decatur Road due to Cape Seal surfacing between Indian View Road and Norman Road. Sign installers and pilot trucks direct traffic through the work area.
- Route 658 (Brent Point Road): Monday through Friday, 7 a.m. to 5 p.m. Alternating one-way traffic on Brent Point Road from Arkendale Road until state maintenance ends due to Cape Seal resurfacing. Sign installers and pilot trucks direct traffic through the work area.
- Route 649 (Richland Road): Monday through Friday, 7 a.m. to 5 p.m. Alternating one-way traffic on Richland Road between Route 17 and Heartwood Road due to Cape Seal surfacing. Sign installers and pilot trucks direct traffic through the work area.
—Virginia Department of Transportation